top of page
Fire rated windows and doors


Fire-Rated Door Installation at Mount Albert Grammar School
After a hard couple of months, our manufacture and install project at Mount Albert Grammar School has completed for Southbase Group. 14 sets of 60/0 and smoke rated fire doors completed with panic hardware and some with integrated electronic locks. These are progress photos, watch this space for better photos. Well done team Steelguard and all at Southbase Group
Mar 7, 20241 min read


Heritage Facade & Fire Door Refurbishment at 131 Queen Street
Working with Cape Limited at the historic Milne and Choyce building at 131 Queen Street, Steelguard are proud to have supplied and installed a number of elements to this scope of work, including refurbishment of the steel windows to the facade of the building, as well as new fire rated doors and screens to the individual floors. Steelguard have also supplied and install new security doors and screens.
Mar 4, 20241 min read


Curved Fire-Rated Windows at Sonata Apartments Auckland
Project | Sonata Apartments
Completed in March 2023, the Sonata Apartments, a five-level luxury residence emerged as a standout project deserving its own post. Located in the seaside suburb of St Heliers, this bold, striking architecturally designed residence encapsulates the very best in timeless modernist living.
Collaborating with CMP Construction Limited, Steelguard designed, manufactured and installed a complex curved EI30/0 fire rated window that had to seamlessly fit w
Feb 29, 20241 min read


Fire-Rated Steel Windows & Doors Ready for Finishing
Another batch of steel fire rated windows and doors ready to be shot blasted, zinc sprayed and two part epoxy painted. Including an EI120 (2 hour integrity and insulation) fire rated window for Auckland’s NZICC project.
Do you have a fire rated window and door protect, then please talk to Steelguard
Feb 28, 20241 min read


Steelguard Wins Fire Screen Contract for Auckland CRL Stations
Steelguard are proud to announce we have been selected to supply and install, large EI60 & EI120 (insulation and integrity) fire rated screens to both Maungawhau, Mount Eden and Katanga-a-hape, K-Road stations on the new CRL extension to Auckland’s busy rail network. These screens are technically challenging due to both their size and the location within the stations that makes access and logistics very challenging.
Feb 20, 20241 min read
bottom of page